Description

The Highway 46 West Water System Expansion project consisted of the following elements:  9,400 LF of 24-inch distribution piping, 8,713 LF of 16-inch distribution piping, 4 jack and bore locations, rock sawing, 0.5 MG post tension water reservoir, 2.5 MGD booster pump station, 3 split case pumps, 3.5 MGD booster pump station, 3 split case pumps, Other requirements included chemical injection system, electrical, instrumentation, SCADA, 86 residential PRV’s and 3 distribution line PRVs.  

Key Features

  • Construction Manager at Risk (CMAR)
  • In Association with Freese & Nichols Engineering
  • Conceptual design through operation in less than 9 months 
  • 3.5 MGD Pump Station
  • 2.5 MGD Pump Station
  • 0.5 MG Water Storage Tank
  • New Braunfels, TX